The 271-km Bengaluru Circular Railway, requiring about 2,500 acres, is planned as a 50-year mobility solution, linking peripheral regions with the suburban rail and highways to ease traffic and boost connectivity, officials said
The 271-km Bengaluru Circular Railway, requiring about 2,500 acres, is planned as a 50-year mobility solution, linking peripheral regions with the suburban rail and highways to ease traffic and boost connectivity, officials said