L&T Metro Rail Hyderabad (L&TMRH), which built and operates the first phase, offering to sell its equity to the Centre or State instead of agreeing to integrate its existing infrastructure — trains and systems — with the proposed second phase of 76.4 km, estimated to cost ₹24,269 crore across five corridors
L&T Metro Rail Hyderabad (L&TMRH), which built and operates the first phase, offering to sell its equity to the Centre or State instead of agreeing to integrate its existing infrastructure — trains and systems — with the proposed second phase of 76.4 km, estimated to cost ₹24,269 crore across five corridors