Spread the love

Water from the tank will be sent through the new pipeline on Platform 8 to fill the tanks of rail coaches; the platform 8 is a little over 600 metres long and can accommodate a full rake of 26 coaches

​Water from the tank will be sent through the new pipeline on Platform 8 to fill the tanks of rail coaches; the platform 8 is a little over 600 metres long and can accommodate a full rake of 26 coaches  

By

Leave a Reply

Your email address will not be published. Required fields are marked *