Spread the love

The students have to use a temporary bamboo bridge to cross the Nallathanni river during the rainy season. The original bridge over the river was swept away in the 2018 floods and has not been reconstructed till now

​The students have to use a temporary bamboo bridge to cross the Nallathanni river during the rainy season. The original bridge over the river was swept away in the 2018 floods and has not been reconstructed till now