Armed forces personnel have been deployed in the Siang River belt for the pre-feasibility study for the 11,000 MW Siang Upper Multi-purpose Project
Armed forces personnel have been deployed in the Siang River belt for the pre-feasibility study for the 11,000 MW Siang Upper Multi-purpose Project