Spread the love

Cauvery V Stage, commissioned in October 2024, has achieved over 50% coverage with over 1.75 lakh connections using 400 MLD of water, as against an allocated 775 MLD for a target of over 3 lakh connections

​Cauvery V Stage, commissioned in October 2024, has achieved over 50% coverage with over 1.75 lakh connections using 400 MLD of water, as against an allocated 775 MLD for a target of over 3 lakh connections