Spread the love

The main challenge involved in salvaging the ship and the dangerous cargo onboard was the report of the ship listing around 10-15 degrees on one side.

​The main challenge involved in salvaging the ship and the dangerous cargo onboard was the report of the ship listing around 10-15 degrees on one side.